Skip to content
CALL TODAY phone number 561.229.1418
CALL TODAY phone number 561.229.1418

PTI C30.1-03: Level 1 Unbonded PT - Field Installation

$105.99

This manual is used in conjunction with PTI’s Level 1 Field Fundamentals training program and provides guidance for field personnel involved in inspection, installation, stressing, and finishing of unbonded single-strand tendons and barrier cables. The latest edition has been updated to include an expanded inspection checklist, information on slab-on-ground installation, and a glossary of post-tensioning terms presented in both English and Spanish.

Glossary of post-tensioning terms presented in both English and Spanish

96 pages; 8½ x 11 in. (soft cover)

Published 2003

9781931085250

Uptryve Systems Uptryve Systems