Skip to content
CALL TODAY phone number 561.229.1418
CALL TODAY phone number 561.229.1418

PSI Arizona C-74 (cr-74) Boilers, Steamfitting and Process Piping (commercial) including solar Certification Package

$1,236.92

To be certified The Arizona Business Management exam must be taken as well.

SCOPE OF WORK
Installation, alteration, and repair of steam and hot water systems and boilers, including solar. Also included are chimney connections, flues, refractories, burners, piping, fittings, valves, thermal insulation, and accessories; fuel and water lines from the source of supply to boilers; process and specialty piping and related equipment; pneumatic and electrical controls.
If necessary, a new circuit may be added to the existing service panel or sub-panel. Excluded is the installation of a new service panel or sub-panel.

The C-74 exam is 50 questions taken over 120 minutes, with a minimum score of 70% required to pass.

The C-74 Solar exam is 30 questions taken over 75 minutes, with a minimum score of 70% required to pass.

The reference material listed above was used to prepare the questions for this examination. The examination may also contain questions based on trade knowledge or general industry practices. Except for Code books, you can base your answers on later editions of references as they become available. For Code questions, the examinations will be based only on the edition of the Code book that is listed.

Candidates may use a silent, nonprinting, non-programmable calculator in the examination center.

For both exams only the first 3 materials are allowed into the exam center. The last material is only for the C-74 Solar exam.

The following reference material is allowed in the examination center:

Code of Federal Regulations - 29 CFR Part 1926 (OSHA)

International Mechanical Code, 2009,

International Fuel Gas Code, 2009

The following reference material is not allowed in the examination center:

Low Pressure Boilers, Frederick M. Steingress, Daryl R. Walker, 2009, 3rd Edition

Modern Hydronic Heating for Residential and Light Commercial Buildings, Second Edition, 2004

IPT's Pipe Trades Handbook

REFERENCE LIST FOR C-74 SOLAR:

The following reference material is not allowed in the examination center:

Solar Water and Pool Heating Design and Installation Manual, 1997

Candidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, annotated and/or indexed prior to the examination session. However, references may not be written in during the examination session. Any candidate caught writing, highlighting, underlining and/or indexing in the references during the examination will be reported to the Arizona Registrar of Contractors. Furthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. References may be tabbed/indexed with permanent tabs only. (permanent tabs are defined as tabs that would tear the page if removed). Temporary tabs, (defined as Post-It notes, or other tabs that may be removed without tearing the page) are not allowed and must be removed from the reference before the exam will begin. If you are downloading from the Internet, you may bring this reference into the testing center with you as long as it is bound. You can have it spiral bound or you may hole-punch it and put it in a binder. 

|title=Mandatory Business Exam|psi-arizona-buisness-management-exam-certification-package|title=Reference Materials|osha-construction-standards-regulations-29-cfr-1926|2009-international-fuel-gas-code|2009-international-mechanical-code|low-pressure-boilers|modern-hydronic-heating-for-residential-and-light-commercial-buildings-heating-ventilation-air-conditioning-by-john-siegenthaler|ipts-pipe-trades-handbook|solar-water-and-pool-heating-design-and-installation-manual|title=Application Service|application-service|
Uptryve Systems Uptryve Systems